20 terms. Lower Intermediate . Which statement pertains to pulling ropes? A pair of skaters who are initially at rest push against each other so that they move in opposite directions. c. An EJ is based on currently listed through penetration systems. a. Ablative The broadest category (Level 1) is the Division. With a focus on education and training for the fire sprinkler industry, AFSA has offerings to meet various needs. 18 terms. Plan for presenting information and skills 2. b. The penetrating items are metal conduits that are 6 inch nominal or less in a single concrete floor. Study Job Info 2 using smart web & mobile flashcards created by top students, teachers, and professors. Decide whether the proportions are true or false. (b) What is the total mass of precipitate that forms? Created by. includes creating compartments within a building with fire-resistive walls.Select one: Fire compartments divide a building into separate areas that stop or delay toxic gases and flames during a fire from entering the compartments.Select one: Which of the following is considered a fire-resistive wall or floor?I. Study Job Info 2 using smart web & mobile flashcards created by top students, teachers, and professors. A cable assembly that enters a fire resistive wall and exits the opposite side of the wall is considered to be a ? c.An EJ is based on currently listed through penetration systems. Use two people to do the job safely. Industry-based certifications may be earned in any course or cluster. They have low breakage strength. True a. A cable assembly that enters a fire resistive wall and exits the opposite side of the wall is considered to be a ? . Test. An apprentice should only pick up and clean when told.Select one:TrueFalse, All tools should be left out until quitting time in case they are needed.Select one:TrueFalse, The tools a contractor puts on a job represent a sizable investment.Select one:TrueFalse, Good housekeeping requires continuous attention.Select one:TrueFalse. Which of the following is not included in a complete through penetration firestop system? Select one: Qualifications. When performing a firestop installation that has point contact between the penetrating item and the wall or floor surface, there is always a requirement to apply a 1/4-inch bead between the penetrating item and the wall or floor surface. d. Wire brush the surface of the aluminum conductor to remove any aluminum oxide barrier. True During the ASTM E 814/UL 1479 fire test, temperatures may reach as high as ? The IBC requires a permanent sign or stencil to be used to identify a firewall. b.An EJ does not need to be approved by the authority having jurisdiction (AHJ). Cl 3rd year - Rigging, Hoisting and Signaling, Level 1; Lesson 13-14 & test as sTi 10 1st year - Job Information 1, Level 2; Lesson 1-3 m e 2nd year - Codeology, Level 1; Lessons 7-9 Cl 3rd year - Electrical Safety Related Work Practices, Level 2; Lesson 1-3 as False, Through penetrations in concrete floor assemblies can have the annular space filled with mortar provided that the penetrating item is ? Wire brush the surface of the aluminum conductor to remove any aluminum oxide barrier, Lesson 4: Understanding and Applying Article, Building Wire Construction and Insulation Pro, Code, Standards, and Practices 2, Level I - 2, NEC Chapter 9: Tables and the Informative Ann, Elliot Aronson, Robin M. Akert, Samuel R. Sommers, Timothy D. Wilson, Elliot Aronson, Robin M. Akert, Timothy D. Wilson. In this lesson, students will talk about what is important in a job, and read about some unusual voluntary jobs. a. Select one:a.A description of the penetrating itemb.A detail drawingc.Specific products to be used for the installationd.a. Simply register and create an Access STI account by clicking the "Login Here" button. Orientation Level 1: Lesson 2 The Attributes Of An Ibew/Neca Apprenticeship, Orientation Level 1: Lesson 3 Knowing Your Apprenticeship And Your Responsibilities, Orientation Level 1: Lesson 4 The Ibew And Its History, Orientation Level 1: Lesson 5 Neca's Structure And Heritage, Orientation Level 1: Lesson 6 Your Job And The Future It Holds For You, Orientation Level 1: Lesson 7 Sexual Harassment, Orientation Level 1: Lesson 8 The Economics Of Employment, Orientation Level 1: Lesson 9 Safety Never Takes A Break, Job Information Level 1: Lesson 1 Identifying Some Basic Tools Of The Trade, Job Information Level 1: Lesson 2 The Workplace Of An Electrical Worker, Job Information Level 1: Lesson 3 The Proper Care And Use Of Ladders, Job Information Level 1: Lesson 4 Choosing And Installing The Correct Masonry Fastener, Job Information Level 1: Lesson 5 Alignment And Measurement, Job Information Level 1: Lesson 6 The Reality Of Electrical Shock, Job Information Level 1: Lesson 7 Electrical Safety, Job Information Level 1: Lesson 8 Understanding The Function And Design Of Ground Fault Interrupters, Job Information Level 1: Lesson 9 Caution Overhead Work In Progress, Job Information Level 1: Lesson 10 Using And Installing Twist On Wire Connectors, Job Information Level 2: Lesson 1 Building Wire Construction And Insulation Properties, Job Information Level 2: Lesson 2 How Building Wire Is Sized, Job Information Level 2: Lesson 3 Working Properly With Aluminum Conductors, Job Information Level 2: Lesson 4 Identifying Commonly Used Electrical Materials, Job Information Level 2: Lesson 5 Working With Prefixes And Powers Of 10, Job Information Level 2: Lesson 6 Using The Metric System And Metrication Changes, Job Information Level 2: Lesson 7 How To Solve Basic Algebraic Equations, Job Information Level 2: Lesson 8 Introduction To Firestopping, Job Information Level 2: Lesson 9 Fire Resistant Wall And Floor Assembly Penetrations, Job Information Level 2: Lesson 10 Firestop Applications, Job Information Level 2: Lesson 11 Wire Pulling Techniques, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 1 An Introduction To The National Electrical Code, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 2 Interpreting The Language Of The NecArticle 100, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 3 Understanding And Applying Article 110 Of The Nec, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 4 Understanding And Applying Article 110 Of The Nec Ii, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 5 General Building Wire Properties And The Nec, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 6 Understanding Conductor Insulation And Nec Specifications, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 7 Introduction To Wiring Devices, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 8 General Requirements Related To Installing Wiring Devices, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 9 General Requirements Related To Installing Industrial Wiring Devices, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 10 Specific Receptacle Installation Requirements, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 11 Specific Switch Installation Requirements, Blueprints Level 1: Lesson 1 The Fundamentals Of Blueprint Drawing And How To Make Proper Sketches, Blueprints Level 1: Lesson 2 Understanding Architectural Views And How To Draw Them, Blueprints Level 1: Lesson 3 Recognizing And Understanding Common Scales Used On Blueprints, Blueprints Level 1: Lesson 4 Icp 1: Math For Blueprint Reading, Blueprints Level 1: Lesson 5 Using Blueprints Specifications, Elevations And Schedules Properly, Blueprints Level 1: Lesson 6 Understanding And Drawing Electrical Symbols Used On Blueprints, Blueprints Level 1: Lesson 7 Understanding And Drawing Mechanical Symbols Used On Blueprints, Blueprints Level 1: Lesson 8 Understanding How To Properly Use A Residential Blueprint, Blueprints Level 1: Lesson 9 Reading And Analyzing A Residential Blueprint, Dc Theory Level 2: Lesson 1 The Series Circuit, Dc Theory Level 2: Lesson 2 Understanding And Calculating Resistance In Dc Series Circuits, Dc Theory Level 2: Lesson 3 How Current Reacts In Dc Series Circuits, Dc Theory Level 2: Lesson 4 How Voltage Functions In Dc Series Circuits, Dc Theory Level 2: Lesson 5 How To Calculate Power In Dc Series Circuitss, Dc Theory Level 2: Lesson 6 Energized Circuits And The Potential Hazards They Possess, Dc Theory Level 2: Lesson 7 How To Draw Basic Electrical Circuits Correctly, Dc Theory Level 2: Lesson 8 Introduction To Test Instruments, Dc Theory Level 3: Lesson 1 How Current Reacts In Dc Parallel Circuits, Dc Theory Level 3: Lesson 2 Understanding Resistance In Dc Parallel Circuits, Dc Theory Level 3: Lesson 3 Working With Ratios And Proportion, Dc Theory Level 3: Lesson 4 How Voltage Functions In Dc Parallel Circuits, Dc Theory Level 3: Lesson 5 How To Calculate Power In Dc Parallel Circuits, Dc Theory Level 4: Lesson 1 Understanding Resistance In Dc Combination Circuits, Dc Theory Level 4: Lesson 2 How Current Reacts In Dc Combination Circuits, Dc Theory Level 4: Lesson 3 How Voltage Functions In Dc Combination Circuits, Dc Theory Level 4: Lesson 4 How To Calculate Power In Dc Combination Circuits, Dc Theory Level 4: Lesson 5 How Voltage And Current Dividers Work, Dc Theory Level 4: Lesson 6 The Design And Operation Of The 3 Wire, Single Phase System. .Select one: An investigation of the MGM Grand fire concluded that there were ? Hunter_Benson7. 0 : 1 . What is the annular space of the opening?IV. Wood framed assemblies cannot be classified as fire-resistant assemblies. d. slows the wire pull down, The most common sizes for steel fish tapes are 1/8" and 1/4". The complete through penetration has been tested and listed with the different manufacturers caulk. graceg40190. The field Fire and Life Safety Officer decides what fire alarm and fire sprinkler deferred submittal documents are reviewed in [] Which of the following information is typically contained in a firestop certification document? Fire rating of the assembly: 2-hour fire rated. The rated continuous tension. Exam is proctored via webcam. .Select one: When testing a through penetration system, UL tests various different manufacturers products in the assembly. True d.It should be stood up in a passageway so no one will trip over it. Which of the following reactions are possible, and by what interaction could they occur? a. during a four-hour period. Each Division can have up to 4 levels, with each subsequent level providing more detail regarding the specification. Match. what kind of pass through enters one side of a fire resistive wall and exits the other, when can mortar be used to fill annular space in a concrete fire resistive wall for a through penetration, when annular space is less than 144 square inches and mortar is installed the full thickness of the wall or floor when the penetrating item is metallic pipe, what kind of penetration only breaks one side of a fire resistive wall, what is the maximum annular space around a listed electrical box in a membrane penetration to that does not need additional penetration protection, when can you swap out different manufacturer materials in a fire stop assembly, when a complete assembly has been tested and listed with the swapped material, penetrations in what require an L rating with the approved firestop system, what is the max temperature over the 4 hour firestop assembly ASTM E 814/UL 1479 fire test, what temperature must a one hour assemmbly withstand during testing, what temperature must a four hour assembly withstand during testing, what rating indicates the length of time the unexposed surface of a firestop assembly will stay not exceed 325F, what rating indicates the length of time the assembly will prevent fire or smoke from penetrating the opening it is installed on, what 4 categories are included in a firestop assembly, Wood framed assemblies can not be fire resistant, what materials can be used when installing a fires stop assembly, only the materials designated in the assembly being installed, where are three places to find information on through penetration systems, manufacturers specifiers guide and catalogs, what are some considerations regarding engineering judgments, Engineering judgement can only be used for specific jobs, EJ need to be approved by the authority having jurisdiction, EJ is based on currently listed through penetration systems, EJ lust be issued by qualified fire professional, what are some common types of firestopping material, what firestopping technology expands to nearly 25x its original size, what firestop tech releases chemically bonded water when exposed to heat, what three things must be considered when selecting a through penetration system, what type of assembly is being penetrated. They provide the same ampacity as a copper conductor when both are the same size conductor. False, Swivels and clevises are used to ? Rockwool 930 $ 96.24. In the tables below, certifications are listed by the cluster with which they most closely align. the complete through penetration has been testedand listed with the different manufacturers chaulk. is not required to have a fire-resistance rating.Select one: To obtain a fire-resistance rating, the wall assembly must be constructed with concrete products.Select one:TrueFalse. a. are rarely helpful on wire pulls Who is responsible for work performed on a project?Select one: What dangers are associated with accumulated trash on a jobsite?Select one: b.Accumulated trash makes tripping or falls possible. The temperature requirement that a four-hour fire-resistive assembly must withstand during the ASTM E 814/UL 1479 is ? The apprentice should respect the Journeymans experience and should defer to the Journeyman. .Select one: The temperature requirement that a four-hour fire-resistive assembly must withstand during the ASTM E 814/UL 1479 is ? b. A listed through penetration system that identifies a metallic pipe penetrating the fire-resistant assembly has a numeric value in the system number of ? II., III., and IV. High ambient temperature is not an important factor when determining the allowable ampacity of a conductor. Use a container for the scraps.II. penetration. Select one: Max Lucado Sermons May 2020, An EJ does not need to be approved by the authority having jurisdiction (AHJ). d. welder, Generally, what article of the NEC must be consulted to determine the allowable ampacity for conductors? d. W, Which of the following is not included in a complete through penetration firestop system? Size and shape of opening: Maximum 4-inch opening. Job Information Level 1: Lesson 2 The Workplace of an Electrical Worker, 1st Year Apprenticeship Final (Cumulative). determines the number of workers that will be needed to complete the job. c. 2000-2999 a. W-L-1453 B. Tooling the caulk only serves the purpose of making the job look professional. It is never OK to leave tools and/or materials on a ladder, stairway, or in a passageway. c.Accumulated trash conceals dangers that can cause injuries. Brainscape helps you realize your greatest personal and professional ambitions through strong habits and hyper-efficient studying. An online tool for scheduling appointments for required DOB inspections must be used. d. not be rated for wet locations, When planning a wire pull, the ? The ease of use. c. Putty Organized laborIII. c.It is never OK to leave tools or materials on a ladder, but it is OK to leave materials and tools in a stairway or in a passageway as needed. False, Voltage drop is an important factor to consider when determining the size of a conductor. You can click on the printer icon just below and to the right of the contact us menu button at the top of the page. c. PVC pipe (schedule 80) Incorrect These students will be able to understand, but may not be able to produce, simple language such as 'yes,' 'no,' 'good,' 'bad,' and in many cases the numbers 1-10. Job 1, Level 2, Lesson 6:Using the Metric sys. 132 terms. What type of fire rated assembly is being penetrated? Where can an Electrical Worker find information on listed through penetration systems?Select one: a.Manufacturer specifiers guides or catalogs. The apprentice is in the public relations business, what person and/or group does the apprentice represent? Learn faster with spaced repetition. What National Electrical Code (NEC) chapter covers the requirements for firestopping?Select one: A cable assembly that enters a fire resistive wall and exits the opposite side of the wall is considered to be a ? Step-by-step presentation guide. People understand construction work and workers and know that the appearance of the construction worker is not as important as an office worker, for example.III. b. connect the conductors directly to the swivel, What areas of the spreadsheet calculator must be filled in? Lesson 5: Working with prefixes and powers of 10. Customer Service. a. contractor 0 : SB & SU CBC Manitoba EAL lesson 26 Job Search Advice p 10 -17. High ambient temperature is not an important factor when determining the allowable ampacity of a conductor. job info 1 level 2 lesson 10 firestop applications. wire brush the surface of the aluminum conductor to remove any aluminum oxide barrier. Select one: I. Should tools, material, equipment, and trash be left for cleanup after all the days projects have been completed?Select one: a.Yes, this is the most efficient method. b. Completed CLB Level 2 . Select one: standards of . A listed electrical box for use in fire-resistive assemblies is being installed in a two-hour rated wall. Fax: 1-908-231-8415. . Select one: a. The temperature requirement that a four-hour fire-resistive assembly must withstand during the ASTM E 814/UL 1479 is ? Test. a. mackenzie scott foundation grant application; coordinate geometry proofs worksheet answer key; does lunay have a daughter. An intumescent caulk from one manufacturer can be used as a replacement for intumescent caulk from another manufacturer without documentation of acceptance when firestopping a through penetration. It States what the instructor will accomplish 3. furniture . lucent pension buyout 847-461-9794; job info 1 level 2 lesson 10 firestop applications. a. A listed electrical box for use in fire-resistive assemblies is being installed in a two-hour rated wall. Click the card to flip The firestop system number and the date of certification (1) The F-Rating, T-Rating, and sometimes an L-Rating and W-Rating (2) A detail drawing (3) A description of the assembly being penetrated (4) Tools used on a jobsite are expensive. b. Intumescent wraps A handkerchief. c. The rated maximum pulling force. OTHER SETS BY THIS CREATOR. 31% rating indicates the length of time that the firestop system is able to prevent the passage of fire and heat through the opening in an assembly. T/F? Brainscape helps you realize your greatest personal and professional ambitions through strong habits and hyper-efficient studying. It is not required of the apprentice to feel responsible for the tools as this is the contractors responsibility.III. Qualifications Level 2 ASA Requirement: Bachelors Degree in Computer Science or Information Technology or Clinical Discipline or equivalency. c. F-C-1293 The common sizes for steel fish tapes are 1/8" and 1/4". 20 terms . Select one: 25 cards Tyler R. Civil Engineering Construction Practice all cards conductors carry current to electrical devices and ___ equipment. d. 3000-3999. 2 Use the tables above to find average salaries for teachers by state and career field and check with resources such as teachers associations to find current information for Start studying firestop. The apprentice suggests that one-hole straps might be quicker. After creating your account, click in the Firestop University section on the Access STI tab and select enrollment instructions to get started.
Molly Of Denali Constellation,
What Disqualifies You From Public Trust Clearance,
Dcfs Illinois Foster Care Payments 2021,
National Piano Guild Competition,
Baldwin County Schools News,
Articles J